Volume 38 (2024)
Volume 37 (2023)
Volume 36 (2022)
Volume 35 (2021)
Volume 34 (2020)
Volume 33 (2019)
Volume 32 (2018)
Volume 31 (2017)
Volume 30 (2016)
Volume 29 (2015)
Volume 28 (2014)
Volume 27 (2013)
Volume 26 (2012)
Volume 25 (2011)
Volume 24 (2010)
Volume 23 (2009)
Volume 22 (2008)
Analysis and Development in Method of Permissible Working Hours of Agricultural Wells in the Khorasan-e-Razavi Province- Case study: Neyshabour Plain

S.A. Haghayeghi; A. Alizadeh

Volume 28, Issue 4 , September and October 2013, , Pages 649-660

https://doi.org/10.22067/jsw.v0i0.41377

Abstract
  Permissible working hours of agricultural wells in the Neyshabour plain was determined equal 4120 hours by regional water authority of Khorasan-e-Razavi. This research was conducted to introduce method of working hours of agricultural wells in the Khorasan-e-Razavi province (case study of Neyshabour ...  Read More